SAFETY REQUIREMENTS:

• Excavations shall be inspected daily by the competent person

• Employees in excavations 5 feet or greater in depth shall be protected from cave-ins

• Access/egress shall be located in trench excavations 4 feet or more in depth

• Employees shall not work in excavations with accumulated water without adequate precautions

• Spoils, materials, and equipment must be kept clear at least 2 feet from edge of trench

• Fall protection required for trenches/excavations 6 feet or greater in depth and 30 inches or wider

1. SITE PLAN & WORK DATE VERIFICATION

2. MARKED UTILITIES OBSERVED

(Include on marked-up site plan)

3. UNMARKED UTILITIES - VISUAL OBSERVATION

Based on visual observation, did you see signs of any unmarked utilities?

4. SITE PHOTOGRAPHY

Photograph the entire proposed work area including all locate marks

5. CREW SAFETY BRIEFING

USA# RESPECT THE MARKS! Only authorized subcontractors may dig on site.

6. EXCAVATIONS 5+ FEET IN DEPTH (WHERE EMPLOYEE WILL ENTER)

Does the trench have potential for hazardous atmosphere?

IN THE EVENT OF DAMAGE:

  • • Notify the Site Supervisor immediately
  • • Do not leave the site without checking in with the Site Supervisor
  • • Photograph entire area and damage location

SUBMISSION REQUIREMENTS:

Submission of this document is required 48 hours prior to any excavation and will be subject to USA or similar utility staking as determined by the Site Supervisor or the Owner.